Mining Mill — You Are Buying Media Consumption, Not Fineness

At plant scale the purchase price is a small part of the cost. Grinding media, liner wear and power per tonne decide whether the circuit makes money.

Free grinding test available · reply within 24 h · no obligation

How we size it
Liner and media specified togetherTurnkey with classificationCommissioning on site
PM-X mining stirred media mill
PM-X series — large-scale stirred media mill for mineral slurry.
The machine

A different sizing logic entirely

A pigment mill is sized by target fineness and batch time. A mining mill is sized by tonnes per hour, specific energy (kWh/t) and the circulating load of the whole circuit. The machine is one component; the classifier and the pump are not optional extras.

Get the specific energy wrong by 20 % and you have bought either an undersized mill or a very expensive pump. That is why we ask for a locked-cycle test result, not a target number.

Sizing

Specific energy is the only honest basis for a quote

Two mines can want the same P80 from the same ore and need mills that differ by a factor of two. The difference is in the ore, and it only shows up in a grindability test.

BasisWhat it tells youWhat it does not
Target P80 onlyNothing about the machine size How much energy your ore needs to get there
Bond work indexBall-mill energy, roughly Stirred media behaviour in the fine range
Specific energy from a lab test (kWh/t)Direct sizing input Whether it holds at scale — needs a pilot step
Locked-cycle pilot resultThe only basis we will guarantee against Long-term media consumption, which still has to be measured

What we will not do: quote a guaranteed throughput from a target P80 alone. If a supplier does that without a test, they are either guessing or planning to renegotiate after installation.

The cost that decides

Media and liner consumption, per tonne

Over a five-year life, grinding media typically costs more than the mill. It is the number that gets left out of the comparison sheet and the one that decides the project.

Line itemHow it scalesWhat to ask for
Grinding mediag per tonne ground — measured, not calculated A consumption guarantee with a measurement method
Rotor and liner wearmm per 1 000 h, strongly ore-dependent Wear-part price list with lead times, before you sign
PowerkWh/t at the design P80 Specific energy at the guarantee point, not at best case
Availability% uptime, dominated by wear-part changes How long a liner change takes and how many people it needs
Specifications

PM-X series

ModelThroughputInstalled power MediaTypical P80Application
PM-X2001 – 5 t/h200 kW 3 – 6 mm15 – 45 µmRegrind, tailings retreatment
PM-X5005 – 20 t/h500 kW 4 – 8 mm20 – 60 µmPrimary regrind
PM-X100020 – 60 t/h1 000 kW 6 – 12 mm25 – 75 µmMain grind, large circuit

Throughput figures here assume a specific ore test. Stirred media mill throughput is not a property of the machine — it is a property of the ore you put through it.

Next step

What a serious enquiry contains

WhatWhy
Circuit flowsheetTells us where the mill sits and what it has to work with
Feed F80 and target P80The two numbers that define the duty
Throughput, t/h (dry solids)Sizes the mill, the pump and the classifier
Ore type and Bond work indexFirst estimate of specific energy
Specific gravity and % solidsSets slurry velocity and residence time
Site constraints — altitude, power supply, ambientDerating is real and often forgotten

Realistic timeline: a mining mill is not a catalogue purchase. Test work, flowsheet review, design, manufacture and site commissioning is a multi-month project. If you need something running this quarter, tell us now and we will say whether that is achievable rather than discovering it later.